Bower, D A (2000) A systematic approach to the evaluation of indirect costs of contract variations. Construction Management and Economics, 18(03), 263-8.

  • Type: Journal Article
  • Keywords: changes; contracts; costs; variations
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/014461900370636
  • Abstract:

    A mechanism is proposed for the evaluation of compensation due in the event of a variation order under contracts for construction work. It demonstrates how the indirect costs of a variation can be derived by the use of influence curves. Commonly it is accepted that such costs are very difficult to evaluate systematically, and hence the parties to the contract have been left to argue over the cost and time effects of a variation and the compensation due. The technique suggested provides a simple solution to this problem.

Cheung, S-O, Tam, C M, Ndekugri, I and Harris, F C (2000) Factors affecting clients' project dispute resolution satisfaction in Hong Kong. Construction Management and Economics, 18(03), 281-94.

Hooper, A and Nicol, C (2000) Design practice and volume production in speculative housebuilding. Construction Management and Economics, 18(03), 295-310.

Lai, L W C (2000) The Coasian market-firm dichotomy and sub-contracting in the construction industry. Construction Management and Economics, 18(03), 355-62.

Love, P E D, Li, H, Irani, Z and Faniran, O (2000) Total quality management and the learning organization: a dialogue for change in construction. Construction Management and Economics, 18(03), 321-31.

Ofori, G (2000) Globalization and construction industry development: research opportunities. Construction Management and Economics, 18(03), 257-62.

Ozdogan, I D and Birgonul, M T (2000) A decision support framework for project sponsors in the planning stage of build-operate-transfer (BOT) projects. Construction Management and Economics, 18(03), 343-53.

Rogers, M (2000) Using Electre III to aid the choice of housing construction process within structural engineering. Construction Management and Economics, 18(03), 333-42.

Slaughter, E S and Shimizu, H (2000) 'Clusters' of innovations in recent long span and multi-segmental bridges. Construction Management and Economics, 18(03), 269-80.

Wang, S Q and Anson, M (2000) Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. Construction Management and Economics, 18(03), 363-72.

Wang, S Q, Tiong, R L K, Ting, S K and Ashley, D (2000) Foreign exchange and revenue risks: analysis of key contract clauses in China's BOT project. Construction Management and Economics, 18(03), 311-20.